{
  "id": "2026-07-07-gaston-college-dallas-campus-power-outage-remote",
  "slug": "gaston-college-dallas-campus-power-outage-remote-2026-07-07",
  "institution": {
    "name": "Gaston College",
    "shortName": "Gaston",
    "state": "NC",
    "type": "community-college",
    "alertSystemName": "GC Alert / official X",
    "enrollment": 5000
  },
  "incident": {
    "date": "2026-07-07",
    "type": "infrastructure",
    "cleryCategory": "emergency-notification",
    "resolution": "resolved",
    "headline": "Dallas campus only shifts to remote after partial power outage",
    "headlinePublic": "Dallas campus only shifts to remote after partial power outage",
    "summary": "Gaston College [moved Dallas campus only to remote learning and work on July 7, 2026 after a partial power outage affecting air conditioning in multiple buildings](https://x.com/Gaston_College/status/2074467324820648384); clinicals continued as normal.",
    "outcome": "Dallas campus remote for the day; clinicals continued; other campuses not named as affected."
  },
  "alerts": [
    {
      "sequence": 1,
      "type": "initial",
      "timestamp": "2026-07-07T08:15:26-04:00",
      "channel": "twitter-x",
      "verbatimText": "Due to a partial power outage affecting air conditioning in multiple buildings, the DALLAS CAMPUS ONLY is moving to a remote learning and work schedule for 7/7/26. Clinicals will continue as normal. Go to https://www.gaston.edu/ for more info.",
      "sourceUrl": "https://x.com/Gaston_College/status/2074467324820648384",
      "sourceDescription": "@Gaston_College Dallas campus power outage remote",
      "characterCount": 243,
      "isVerbatimConfirmed": true,
      "confidence": "high",
      "annotations": [
        "Second blind transcription: independent keyword_search + thread_fetch byte-identical sha256 cec569a72a8c6ecfaf04142b4d6ba82221de604c2fa472599b18b867169d099e. SPN 523."
      ]
    }
  ],
  "context": "Gaston College posts campus operations notices on [@Gaston_College](https://x.com/Gaston_College). Partial HVAC power loss drove a single-campus remote day rather than a college-wide closure.",
  "keyFindings": [
    "Campus-scoped (Dallas only) infrastructure remote day with clinicals exempted.",
    "Hazard named as partial power outage affecting air conditioning in multiple buildings."
  ],
  "sources": [
    {
      "title": "@Gaston_College Dallas campus power outage remote",
      "url": "https://x.com/Gaston_College/status/2074467324820648384",
      "type": "official-social",
      "accessDate": "2026-08-06",
      "archiveUrl": null,
      "archiveNotes": "SPN 523"
    }
  ],
  "confidence": "high",
  "tags": [
    "community-college",
    "north-carolina",
    "infrastructure",
    "power-outage",
    "remote-learning",
    "gaston-college"
  ],
  "dateAdded": "2026-08-06",
  "lastUpdated": "2026-08-06",
  "addedBy": "ingestion",
  "annotations": [
    "EXPANSION batch 323. Dual-blind X confirmation. Census residual Gaston CC."
  ]
}
