{
  "id": "2025-09-09-holy-cross-library-electrical-repairs",
  "slug": "holy-cross-library-electrical-repairs-2025-09-09",
  "institution": {
    "name": "College of the Holy Cross",
    "shortName": "Holy Cross",
    "state": "MA",
    "type": "private-liberal-arts",
    "alertSystemName": "Holy Cross Libraries status page",
    "enrollment": 3162
  },
  "incident": {
    "date": "2025-09-09",
    "type": "infrastructure-failure",
    "cleryCategory": "advisory",
    "resolution": "confirmed-threat",
    "headline": "Electrical repairs close two libraries for the evening",
    "headlinePublic": "Electrical repairs close two libraries for the evening",
    "summary": "Holy Cross Libraries [closed Dinand Library and the Music Library at 6 p.m. for urgent electrical repairs](https://holycrosslibraries.statuspage.io/incidents/cxp2qdwm9f33).",
    "outcome": "Both libraries were to close at 6 p.m. Operations were expected back by Wednesday morning.",
    "endDate": "2025-09-10"
  },
  "alerts": [
    {
      "sequence": 1,
      "type": "initial",
      "timestamp": "2025-09-09T15:23:09-04:00",
      "channel": "website",
      "verbatimText": "Dinand Library and the Music Library will be closed tonight due to urgent electrical repairs. Both buildings will close at 6 p.m., and the work is expected to take up to four hours. We expect that all operations will return to normal by Wednesday morning.",
      "isVerbatimConfirmed": true,
      "confidence": "high",
      "sourceUrl": "https://holycrosslibraries.statuspage.io/incidents/cxp2qdwm9f33",
      "sourceDescription": "Holy Cross Libraries status page",
      "annotations": [
        "Dual fetch 2026-10-12. The incident JSON matched on both reads, and the same sentence is in the incident HTML. 255 characters. sha256 98bac6d65a917af6946023b3863223fd9f3c679adea5e9ea0cb5b12138771943.",
        "The 2025-09-10 update is only the statuspage line that the incident has been resolved. It was not filed.",
        "SPN not attempted at 10:50Z"
      ],
      "characterCount": 255
    }
  ],
  "context": "One notice on the Holy Cross Libraries status page, posted 2025-09-09T15:23:09-04:00. A later statuspage line says only that the incident has been resolved. That line was not filed.",
  "keyFindings": [
    "Urgent electrical repairs closed two libraries at 6 p.m.",
    "The work was expected to last up to four hours."
  ],
  "sources": [
    {
      "title": "Holy Cross Libraries status page",
      "url": "https://holycrosslibraries.statuspage.io/incidents/cxp2qdwm9f33",
      "type": "official-archive",
      "accessDate": "2026-10-12",
      "archiveUrl": null,
      "archiveNotes": "SPN not attempted at 10:50Z"
    }
  ],
  "confidence": "high",
  "tags": [
    "private-liberal-arts",
    "massachusetts",
    "infrastructure"
  ],
  "dateAdded": "2026-10-12",
  "lastUpdated": "2026-10-12",
  "addedBy": "ingestion"
}
