Skip to content
Campus Alert Archive
Delgado

Delgado City Park Campus closed for water leak

AI-generated · every claim is source-linked
LAfacilityemergency notificationhigh confidence

Delgado Community College closed only the City Park Campus immediately for a water leak on Feb 13, 2026 while other sites stayed open.

Alerts
1
Response
Killed
Injured
Institution
Delgado Community College
Community College · LA
All Delgado cases →
~16,000 studentsDelgado Alert / official social
Official alert policy
Read when and how Delgado says it will use Delgado Alert (Omnilert): summarized, quoted, and analyzed.
Documented Timeline

Alert Sequence

1 message in sequence · 1 verified verbatim

Confirmed wording is transcribed character-for-character from a primary source. Use Verify this quote under each message to open that source in a new tab and compare the text yourself.

INITIAL ALERTTwitter/X
Verified verbatim262 chars
The City Park Campus is closed effective immediately due to a water leak. This closure applies to City Park only. All other campuses & sites remain open. All essential facilities personnel must report to work as scheduled. Monitor https://dcc.edu/ for updates.
Verbatim from official @delgadocc X account.
Message elements

How the first alert is built

To check this alert, Claude (an AI) read it in full 25 separate times, independently. Each read decided whether the message answers each of the six questions and gave a short reason. A final reviewer then weighed all 25 and wrote the plain-English verdict you see when you open a row. The score (for example 22/25) is how many reads agreed; the 25 individual reads are tucked underneath if you want to check them.

The City Park Campus is closed effective immediately due to a water leak. This closure applies to City Park only. All other campuses & sites remain open. All essential facilities personnel must report to work as scheduled. Monitor https://dcc.edu/ for updates.

  • Sourcepresent25/25

    Final assessment

    Arbitrator consensus: Official institutional Delgado names source via campus alert voice.

    Who is sending the alert and who is responding. People act faster on a message from a clearly identifiable, credible sender, such as a named department, the police, or a branded alert system, than on an anonymous notice. A branded signature counts.

    See all 25 individual reads
    1. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 1 of 25 for this alert.
    2. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 2 of 25 for this alert.
    3. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 3 of 25 for this alert.
    4. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 4 of 25 for this alert.
    5. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 5 of 25 for this alert.
    6. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 6 of 25 for this alert.
    7. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 7 of 25 for this alert.
    8. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 8 of 25 for this alert.
    9. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 9 of 25 for this alert.
    10. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 10 of 25 for this alert.
    11. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 11 of 25 for this alert.
    12. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 12 of 25 for this alert.
    13. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 13 of 25 for this alert.
    14. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 14 of 25 for this alert.
    15. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 15 of 25 for this alert.
    16. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 16 of 25 for this alert.
    17. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 17 of 25 for this alert.
    18. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 18 of 25 for this alert.
    19. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 19 of 25 for this alert.
    20. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 20 of 25 for this alert.
    21. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 21 of 25 for this alert.
    22. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 22 of 25 for this alert.
    23. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 23 of 25 for this alert.
    24. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 24 of 25 for this alert.
    25. present: Official institutional Delgado names source via campus alert voice. Independent coding pass 25 of 25 for this alert.
  • Hazardpresent25/25

    Final assessment

    Arbitrator consensus: Water leak is the hazard cue.

    What the threat actually is. A complete warning names the specific danger, such as a shooter, a fire, a tornado, or a gas leak, rather than a vague emergency, because people decide what to do based on what they are facing.

    See all 25 individual reads
    1. present: Water leak is the hazard cue. Independent coding pass 1 of 25 for this alert.
    2. present: Water leak is the hazard cue. Independent coding pass 2 of 25 for this alert.
    3. present: Water leak is the hazard cue. Independent coding pass 3 of 25 for this alert.
    4. present: Water leak is the hazard cue. Independent coding pass 4 of 25 for this alert.
    5. present: Water leak is the hazard cue. Independent coding pass 5 of 25 for this alert.
    6. present: Water leak is the hazard cue. Independent coding pass 6 of 25 for this alert.
    7. present: Water leak is the hazard cue. Independent coding pass 7 of 25 for this alert.
    8. present: Water leak is the hazard cue. Independent coding pass 8 of 25 for this alert.
    9. present: Water leak is the hazard cue. Independent coding pass 9 of 25 for this alert.
    10. present: Water leak is the hazard cue. Independent coding pass 10 of 25 for this alert.
    11. present: Water leak is the hazard cue. Independent coding pass 11 of 25 for this alert.
    12. present: Water leak is the hazard cue. Independent coding pass 12 of 25 for this alert.
    13. present: Water leak is the hazard cue. Independent coding pass 13 of 25 for this alert.
    14. present: Water leak is the hazard cue. Independent coding pass 14 of 25 for this alert.
    15. present: Water leak is the hazard cue. Independent coding pass 15 of 25 for this alert.
    16. present: Water leak is the hazard cue. Independent coding pass 16 of 25 for this alert.
    17. present: Water leak is the hazard cue. Independent coding pass 17 of 25 for this alert.
    18. present: Water leak is the hazard cue. Independent coding pass 18 of 25 for this alert.
    19. present: Water leak is the hazard cue. Independent coding pass 19 of 25 for this alert.
    20. present: Water leak is the hazard cue. Independent coding pass 20 of 25 for this alert.
    21. present: Water leak is the hazard cue. Independent coding pass 21 of 25 for this alert.
    22. present: Water leak is the hazard cue. Independent coding pass 22 of 25 for this alert.
    23. present: Water leak is the hazard cue. Independent coding pass 23 of 25 for this alert.
    24. present: Water leak is the hazard cue. Independent coding pass 24 of 25 for this alert.
    25. present: Water leak is the hazard cue. Independent coding pass 25 of 25 for this alert.
  • Locationpresent25/25

    Final assessment

    Arbitrator consensus: City Park Campus only is the location scope.

    Where the threat is. Saying whether danger is in a specific building, a part of campus, or area-wide lets people judge their own proximity and choose a safe direction. Without a where, a warning is hard to act on precisely.

    See all 25 individual reads
    1. present: City Park Campus only is the location scope. Independent coding pass 1 of 25 for this alert.
    2. present: City Park Campus only is the location scope. Independent coding pass 2 of 25 for this alert.
    3. present: City Park Campus only is the location scope. Independent coding pass 3 of 25 for this alert.
    4. present: City Park Campus only is the location scope. Independent coding pass 4 of 25 for this alert.
    5. present: City Park Campus only is the location scope. Independent coding pass 5 of 25 for this alert.
    6. present: City Park Campus only is the location scope. Independent coding pass 6 of 25 for this alert.
    7. present: City Park Campus only is the location scope. Independent coding pass 7 of 25 for this alert.
    8. present: City Park Campus only is the location scope. Independent coding pass 8 of 25 for this alert.
    9. present: City Park Campus only is the location scope. Independent coding pass 9 of 25 for this alert.
    10. present: City Park Campus only is the location scope. Independent coding pass 10 of 25 for this alert.
    11. present: City Park Campus only is the location scope. Independent coding pass 11 of 25 for this alert.
    12. present: City Park Campus only is the location scope. Independent coding pass 12 of 25 for this alert.
    13. present: City Park Campus only is the location scope. Independent coding pass 13 of 25 for this alert.
    14. present: City Park Campus only is the location scope. Independent coding pass 14 of 25 for this alert.
    15. present: City Park Campus only is the location scope. Independent coding pass 15 of 25 for this alert.
    16. present: City Park Campus only is the location scope. Independent coding pass 16 of 25 for this alert.
    17. present: City Park Campus only is the location scope. Independent coding pass 17 of 25 for this alert.
    18. present: City Park Campus only is the location scope. Independent coding pass 18 of 25 for this alert.
    19. present: City Park Campus only is the location scope. Independent coding pass 19 of 25 for this alert.
    20. present: City Park Campus only is the location scope. Independent coding pass 20 of 25 for this alert.
    21. present: City Park Campus only is the location scope. Independent coding pass 21 of 25 for this alert.
    22. present: City Park Campus only is the location scope. Independent coding pass 22 of 25 for this alert.
    23. present: City Park Campus only is the location scope. Independent coding pass 23 of 25 for this alert.
    24. present: City Park Campus only is the location scope. Independent coding pass 24 of 25 for this alert.
    25. present: City Park Campus only is the location scope. Independent coding pass 25 of 25 for this alert.
  • Guidancepresent25/25

    Final assessment

    Arbitrator consensus: Essential facilities personnel report guidance present.

    The protective action to take. A clear, specific instruction, such as shelter in place, evacuate, avoid the area, or run-hide-fight, drives faster and more correct protective behavior than describing the threat alone.

    See all 25 individual reads
    1. present: Essential facilities personnel report guidance present. Independent coding pass 1 of 25 for this alert.
    2. present: Essential facilities personnel report guidance present. Independent coding pass 2 of 25 for this alert.
    3. present: Essential facilities personnel report guidance present. Independent coding pass 3 of 25 for this alert.
    4. present: Essential facilities personnel report guidance present. Independent coding pass 4 of 25 for this alert.
    5. present: Essential facilities personnel report guidance present. Independent coding pass 5 of 25 for this alert.
    6. present: Essential facilities personnel report guidance present. Independent coding pass 6 of 25 for this alert.
    7. present: Essential facilities personnel report guidance present. Independent coding pass 7 of 25 for this alert.
    8. present: Essential facilities personnel report guidance present. Independent coding pass 8 of 25 for this alert.
    9. present: Essential facilities personnel report guidance present. Independent coding pass 9 of 25 for this alert.
    10. present: Essential facilities personnel report guidance present. Independent coding pass 10 of 25 for this alert.
    11. present: Essential facilities personnel report guidance present. Independent coding pass 11 of 25 for this alert.
    12. present: Essential facilities personnel report guidance present. Independent coding pass 12 of 25 for this alert.
    13. present: Essential facilities personnel report guidance present. Independent coding pass 13 of 25 for this alert.
    14. present: Essential facilities personnel report guidance present. Independent coding pass 14 of 25 for this alert.
    15. present: Essential facilities personnel report guidance present. Independent coding pass 15 of 25 for this alert.
    16. present: Essential facilities personnel report guidance present. Independent coding pass 16 of 25 for this alert.
    17. present: Essential facilities personnel report guidance present. Independent coding pass 17 of 25 for this alert.
    18. present: Essential facilities personnel report guidance present. Independent coding pass 18 of 25 for this alert.
    19. present: Essential facilities personnel report guidance present. Independent coding pass 19 of 25 for this alert.
    20. present: Essential facilities personnel report guidance present. Independent coding pass 20 of 25 for this alert.
    21. present: Essential facilities personnel report guidance present. Independent coding pass 21 of 25 for this alert.
    22. present: Essential facilities personnel report guidance present. Independent coding pass 22 of 25 for this alert.
    23. present: Essential facilities personnel report guidance present. Independent coding pass 23 of 25 for this alert.
    24. present: Essential facilities personnel report guidance present. Independent coding pass 24 of 25 for this alert.
    25. present: Essential facilities personnel report guidance present. Independent coding pass 25 of 25 for this alert.
  • Timepresent25/25

    Final assessment

    Arbitrator consensus: Effective immediately timing present.

    When the message applies. A timestamp, the word now or immediately, or a phrase like until further notice tells the reader whether the danger is current and how quickly to act.

    See all 25 individual reads
    1. present: Effective immediately timing present. Independent coding pass 1 of 25 for this alert.
    2. present: Effective immediately timing present. Independent coding pass 2 of 25 for this alert.
    3. present: Effective immediately timing present. Independent coding pass 3 of 25 for this alert.
    4. present: Effective immediately timing present. Independent coding pass 4 of 25 for this alert.
    5. present: Effective immediately timing present. Independent coding pass 5 of 25 for this alert.
    6. present: Effective immediately timing present. Independent coding pass 6 of 25 for this alert.
    7. present: Effective immediately timing present. Independent coding pass 7 of 25 for this alert.
    8. present: Effective immediately timing present. Independent coding pass 8 of 25 for this alert.
    9. present: Effective immediately timing present. Independent coding pass 9 of 25 for this alert.
    10. present: Effective immediately timing present. Independent coding pass 10 of 25 for this alert.
    11. present: Effective immediately timing present. Independent coding pass 11 of 25 for this alert.
    12. present: Effective immediately timing present. Independent coding pass 12 of 25 for this alert.
    13. present: Effective immediately timing present. Independent coding pass 13 of 25 for this alert.
    14. present: Effective immediately timing present. Independent coding pass 14 of 25 for this alert.
    15. present: Effective immediately timing present. Independent coding pass 15 of 25 for this alert.
    16. present: Effective immediately timing present. Independent coding pass 16 of 25 for this alert.
    17. present: Effective immediately timing present. Independent coding pass 17 of 25 for this alert.
    18. present: Effective immediately timing present. Independent coding pass 18 of 25 for this alert.
    19. present: Effective immediately timing present. Independent coding pass 19 of 25 for this alert.
    20. present: Effective immediately timing present. Independent coding pass 20 of 25 for this alert.
    21. present: Effective immediately timing present. Independent coding pass 21 of 25 for this alert.
    22. present: Effective immediately timing present. Independent coding pass 22 of 25 for this alert.
    23. present: Effective immediately timing present. Independent coding pass 23 of 25 for this alert.
    24. present: Effective immediately timing present. Independent coding pass 24 of 25 for this alert.
    25. present: Effective immediately timing present. Independent coding pass 25 of 25 for this alert.
  • Impactabsent0/25

    Final assessment

    Arbitrator consensus: No severity impact adjectives beyond operational change.

    What the hazard could do to the people in its path. Beyond naming the threat, a complete warning conveys its potential consequences or severity, such as that a tornado can level buildings or that a leak could be explosive, so recipients grasp how much danger they are in. Research on warning message content finds that a concrete impact statement helps people personalize their risk and act sooner.

    See all 25 individual reads
    1. absent: No severity impact adjectives beyond operational change. Independent coding pass 1 of 25 for this alert.
    2. absent: No severity impact adjectives beyond operational change. Independent coding pass 2 of 25 for this alert.
    3. absent: No severity impact adjectives beyond operational change. Independent coding pass 3 of 25 for this alert.
    4. absent: No severity impact adjectives beyond operational change. Independent coding pass 4 of 25 for this alert.
    5. absent: No severity impact adjectives beyond operational change. Independent coding pass 5 of 25 for this alert.
    6. absent: No severity impact adjectives beyond operational change. Independent coding pass 6 of 25 for this alert.
    7. absent: No severity impact adjectives beyond operational change. Independent coding pass 7 of 25 for this alert.
    8. absent: No severity impact adjectives beyond operational change. Independent coding pass 8 of 25 for this alert.
    9. absent: No severity impact adjectives beyond operational change. Independent coding pass 9 of 25 for this alert.
    10. absent: No severity impact adjectives beyond operational change. Independent coding pass 10 of 25 for this alert.
    11. absent: No severity impact adjectives beyond operational change. Independent coding pass 11 of 25 for this alert.
    12. absent: No severity impact adjectives beyond operational change. Independent coding pass 12 of 25 for this alert.
    13. absent: No severity impact adjectives beyond operational change. Independent coding pass 13 of 25 for this alert.
    14. absent: No severity impact adjectives beyond operational change. Independent coding pass 14 of 25 for this alert.
    15. absent: No severity impact adjectives beyond operational change. Independent coding pass 15 of 25 for this alert.
    16. absent: No severity impact adjectives beyond operational change. Independent coding pass 16 of 25 for this alert.
    17. absent: No severity impact adjectives beyond operational change. Independent coding pass 17 of 25 for this alert.
    18. absent: No severity impact adjectives beyond operational change. Independent coding pass 18 of 25 for this alert.
    19. absent: No severity impact adjectives beyond operational change. Independent coding pass 19 of 25 for this alert.
    20. absent: No severity impact adjectives beyond operational change. Independent coding pass 20 of 25 for this alert.
    21. absent: No severity impact adjectives beyond operational change. Independent coding pass 21 of 25 for this alert.
    22. absent: No severity impact adjectives beyond operational change. Independent coding pass 22 of 25 for this alert.
    23. absent: No severity impact adjectives beyond operational change. Independent coding pass 23 of 25 for this alert.
    24. absent: No severity impact adjectives beyond operational change. Independent coding pass 24 of 25 for this alert.
    25. absent: No severity impact adjectives beyond operational change. Independent coding pass 25 of 25 for this alert.

Systematic AI judgments with visible reasoning, not human-validated codings.

About this analysis
Context

Background

Wider b366 virgin Delgado single-campus facility water-leak close.
Analysis

Key Findings

Single-campus City Park water-leak close; other sites open.
Outcome
City Park-only closure for water leak; other campuses remained open.
Provenance

Sources

Every claim on this page is meant to be checkable. Open the links below (and the Verify this quote control under each confirmed alert) to read the original university, news, or archive page yourself. Hostnames are shown so you can see where you are going; archived copies survive when live pages move or disappear. See also our methodology.

  1. Social
Cite this case

Campus Alert Archive. "Delgado Community College: Delgado City Park Campus closed for water leak." Incident of February 13, 2026. Added July 2026. https://campusalertarchive.com/case/delgado-community-college-city-park-water-leak-closure-2026-02-13/

Download case JSON

Alert text quoted on this page remains the work of the issuing institution; the archive is a secondary source.

Tags
louisianafacilitycommunity-collegewider-reach
Added July 2026Updated July 2026Via ingestion