Skip to content
Campus Alert Archive
UW

Gas leak reported near tower complex

AI-generated · every claim is source-linked
WAweatheremergency notificationhigh confidence

University of Washington published an official alert on or about 2019-10-14. Full text is preserved from the official archive.

Alerts
1
Response
—
Killed
0
Injured
0
Institution
University of Washington
Public R1 · WA
All UW cases →
~50,000 studentsUW Alert
Official alert policy
Read when and how UW says it will use UW Alert: summarized, quoted, and analyzed.
Documented Timeline

Alert Sequence

1 message in sequence · 1 verified verbatim

Confirmed wording is transcribed character-for-character from a primary source. Use Verify this quote under each message to open that source in a new tab and compare the text yourself.

INITIAL ALERTMulti-channel
Verified verbatim1826 chars
UPDATE at 5:57 p.m.: All clear. The gas leak near UW Tower has been resolved. Expect traffic delays in the area tonight and Tuesday morning as crews continue work in the area. The UW Tower and nearby buildings are clear for re-entry. UPDATE at 5:30 p.m.: Crews have secured the gas leak near UW Tower, at Brooklyn Ave NE and NE 45th St. Officials are checking nearby buildings and will reopen them when they are deemed safe, by approximately 6 p.m. The UW Tower is now clear for entry. Roads in the area will begin to open, though officials advise that eastbound NE 45th St. will likely remain closed to traffic for several hours. UPDATE at 3:32 p.m.: Seattle FD has updated the evacuation map again, now north to NE 47th St. UPDATE at 3:10 p.m.: Seattle FD has updated the evacuation map: UPDATE at 3 p.m.: Officials are estimating two to three hours before the gas leak at Brooklyn Ave. NE and NE 45th St. is cleared. The perimeter has also been extended to the east from University Way NE to 15th Ave. NE. The perimeter to the north is NE 47th St. UPDATE at 2:35 p.m.: Fire and utility crews are still working to address the gas leak at Brooklyn Ave. NE and NE 45th St. Anyone leaving the UW Tower is asked to move to the south of the building. Here is the evacuation map shared by Seattle FD: NE 45th St. and Brooklyn Ave. NE: this is the current evacuation zone, please continue to avoid the area until the leak is secured. PSE has arrived on scene. pic.twitter.com/ryBVu2c9eY - Seattle Fire Dept. (@SeattleFire) October 14, 2019 ORIGINAL POST: Seattle Fire Department is responding to a reported gas leak at a construction site at Brooklyn Ave. NE and NE 45th St. near the UW Tower. The Tower is currently being evacuated. Please avoid the area. More information will be provided here as it becomes available.
Transcribed from official institutional alert archive page.
Confirmed-verbatim recovery from live institutional source.
Message elements

How the first alert is built

To check this alert, Claude Opus 5 (an AI) read it in full 25 separate times, independently. Each read decided whether the message answers each of the six questions and gave a short reason. A final reviewer then weighed all 25 and wrote the plain-English verdict you see when you open a row. The score (for example 22/25) is how many reads agreed; the 25 individual reads are tucked underneath if you want to check them.

UPDATE at 5:57 p.m.: All clear. The gas leak near UW Tower has been resolved. Expect traffic delays in the area tonight and Tuesday morning as crews continue work in the area. The UW Tower and nearby buildings are clear for re-entry. UPDATE at 5:30 p.m.: Crews have secured the gas leak near UW Tower, at Brooklyn Ave NE and NE 45th St. Officials are checking nearby buildings and will reopen them when they are deemed safe, by approximately 6 p.m. The UW Tower is now clear for entry. Roads in the area will begin to open, though officials advise that eastbound NE 45th St. will likely remain closed to traffic for several hours. UPDATE at 3:32 p.m.: Seattle FD has updated the evacuation map again, now north to NE 47th St. UPDATE at 3:10 p.m.: Seattle FD has updated the evacuation map: UPDATE at 3 p.m.: Officials are estimating two to three hours before the gas leak at Brooklyn Ave. NE and NE 45th St. is cleared. The perimeter has also been extended to the east from University Way NE to 15th Ave. NE. The perimeter to the north is NE 47th St. UPDATE at 2:35 p.m.: Fire and utility crews are still working to address the gas leak at Brooklyn Ave. NE and NE 45th St. Anyone leaving the UW Tower is asked to move to the south of the building. Here is the evacuation map shared by Seattle FD: NE 45th St. and Brooklyn Ave. NE: this is the current evacuation zone, please continue to avoid the area until the leak is secured. PSE has arrived on scene. pic.twitter.com/ryBVu2c9eY - Seattle Fire Dept. (@SeattleFire) October 14, 2019 ORIGINAL POST: Seattle Fire Department is responding to a reported gas leak at a construction site at Brooklyn Ave. NE and NE 45th St. near the UW Tower. The Tower is currently being evacuated. Please avoid the area. More information will be provided here as it becomes available.

  • Sourcepresent25/25

    Final assessment

    Present, 25 of 25. The authority is named outright, "Seattle Fire Department is responding", reinforced by the quoted post from "Seattle Fire Dept. (@SeattleFire)" and by PSE arriving on scene.

    Who is sending the alert and who is responding. People act faster on a message from a clearly identifiable, credible sender, such as a named department, the police, or a branded alert system, than on an anonymous notice. A branded signature counts.

    See all 25 individual reads
    1. present: "Seattle Fire Department" and its @SeattleFire account are named as the responding authority.
    2. present: Seattle Fire Department, its Twitter account, and PSE are named as responding agencies.
    3. present: Seattle Fire Department, PSE and officials are named, including a tagged Seattle Fire Dept. post.
    4. present: "Seattle Fire Department" and its @SeattleFire account are named as issuing information.
    5. present: "Seattle Fire Department" and "Seattle FD" are named throughout as the responding authority.
    6. present: "Seattle Fire Department" and its @SeattleFire account are identified, along with utility crews and PSE.
    7. present: "Seattle Fire Department" and "Seattle FD" are named as the responding authority.
    8. present: "Seattle Fire Department" and "Seattle FD" are named as the responding agency.
    9. present: "Seattle Fire Department", "Seattle FD" and "PSE" are named as responding agencies.
    10. present: "Seattle Fire Department" and "Seattle FD" are repeatedly named as the responding agency.
    11. present: Seattle Fire Department, PSE and "Officials" are named as the responding authorities.
    12. present: "Seattle Fire Department" and the tweeting "Seattle Fire Dept. (@SeattleFire)" identify the authority.
    13. present: Seattle Fire Department, Seattle FD and PSE are all named as responding agencies.
    14. present: The Seattle Fire Department, PSE and "Officials" are named as the responding authorities.
    15. present: "Seattle Fire Department" and its @SeattleFire account are named as the issuing responders.
    16. present: "Seattle Fire Department", "Seattle FD" and "PSE" are named as the responding agencies.
    17. present: "Seattle Fire Department" and "Seattle FD" are named as the responding agency.
    18. present: "Seattle Fire Department" and "Seattle FD" are named as the responding and mapping authority.
    19. present: "Seattle Fire Department" and "Seattle FD" are named, including a quoted departmental post.
    20. present: "Seattle FD" and the Seattle Fire Department are identified throughout as the responding agency.
    21. present: "Seattle Fire Department", "Seattle FD" and "PSE" are named as the responding agencies and utility.
    22. present: "Seattle Fire Department", "Seattle FD", "PSE" and "Officials" are all named as the responding authorities.
    23. present: "Seattle Fire Department" and its @SeattleFire account are named as the responding authority.
    24. present: "Seattle Fire Department", "Seattle FD" and "PSE" are named as the responding authorities.
    25. present: "Seattle Fire Department", "Seattle FD" and "PSE" are named as responding agencies.
  • Hazardpresent25/25

    Final assessment

    Present, 25 of 25. The hazard is stated plainly as "a reported gas leak at a construction site" near the UW Tower, and tracked until it "has been resolved".

    What the threat actually is. A complete warning names the specific danger, such as a shooter, a fire, a tornado, or a gas leak, rather than a vague emergency, because people decide what to do based on what they are facing.

    See all 25 individual reads
    1. present: The hazard is explicitly "a reported gas leak at a construction site".
    2. present: A gas leak at a construction site is the named hazard throughout.
    3. present: A gas leak at a construction site is the explicitly named hazard.
    4. present: The hazard is repeatedly named as a gas leak at a construction site.
    5. present: The hazard is "a reported gas leak at a construction site", clearly specified.
    6. present: The hazard is a "reported gas leak at a construction site", named specifically.
    7. present: A "gas leak" at a construction site is named as the specific hazard.
    8. present: The hazard is repeatedly named as a "gas leak" at a construction site.
    9. present: The hazard is repeatedly named as a "gas leak at a construction site".
    10. present: The hazard is explicitly "a reported gas leak at a construction site".
    11. present: The named hazard is a gas leak at a construction site.
    12. present: It names "a reported gas leak at a construction site", a specific hazard.
    13. present: A "gas leak at a construction site" is a specific named hazard.
    14. present: A "gas leak" at a construction site is a specific, named hazard.
    15. present: The hazard is a "gas leak at a construction site", named specifically.
    16. present: The repeated hazard is "a reported gas leak at a construction site", specific and named.
    17. present: The hazard is a "gas leak at a construction site", clearly specified.
    18. present: The hazard is repeatedly named as "the gas leak" at a construction site.
    19. present: The hazard is "a reported gas leak at a construction site", named specifically.
    20. present: The hazard is repeatedly named as a "gas leak" at a construction site.
    21. present: The hazard is repeatedly named as "a reported gas leak at a construction site".
    22. present: It repeatedly names a "gas leak" at a construction site, a specific hazard.
    23. present: The hazard is repeatedly named as "a gas leak" at a construction site.
    24. present: The hazard is repeatedly named as "a reported gas leak at a construction site".
    25. present: The named hazard is a "gas leak at a construction site".
  • Locationpresent25/25

    Final assessment

    Present, 25 of 25. The leak is fixed at "Brooklyn Ave. NE and NE 45th St." near the UW Tower, with the perimeter extended to "15th Ave. NE" and north to "NE 47th St.".

    Where the threat is. Saying whether danger is in a specific building, a part of campus, or area-wide lets people judge their own proximity and choose a safe direction. Without a where, a warning is hard to act on precisely.

    See all 25 individual reads
    1. present: It names "Brooklyn Ave. NE and NE 45th St." and the "UW Tower".
    2. present: Brooklyn Ave. NE and NE 45th St. near the UW Tower is precisely given.
    3. present: Brooklyn Ave. NE and NE 45th St. near the UW Tower is precisely given.
    4. present: Location is "Brooklyn Ave. NE and NE 45th St. near the UW Tower" with a mapped perimeter.
    5. present: It is placed at "Brooklyn Ave. NE and NE 45th St. near the UW Tower".
    6. present: It repeatedly gives "Brooklyn Ave. NE and NE 45th St. near the UW Tower" and the evacuation perimeter.
    7. present: Locations include "Brooklyn Ave. NE and NE 45th St." and the UW Tower.
    8. present: It gives "Brooklyn Ave. NE and NE 45th St." and the "UW Tower".
    9. present: It names "Brooklyn Ave. NE and NE 45th St." and "the UW Tower".
    10. present: It locates the leak at "Brooklyn Ave. NE and NE 45th St. near the UW Tower".
    11. present: UW Tower, Brooklyn Ave. NE and NE 45th St., plus the evacuation perimeter, are specified.
    12. present: It locates the leak at "Brooklyn Ave. NE and NE 45th St. near the UW Tower".
    13. present: Brooklyn Ave. NE and NE 45th St. near the UW Tower is precisely given.
    14. present: Brooklyn Ave NE and NE 45th St near the UW Tower, with an evacuation perimeter, locate it precisely.
    15. present: It gives "Brooklyn Ave. NE and NE 45th St. near the UW Tower" and an evacuation perimeter.
    16. present: It gives "Brooklyn Ave. NE and NE 45th St. near the UW Tower" and a perimeter to NE 47th St.
    17. present: It names "Brooklyn Ave. NE and NE 45th St. near the UW Tower" and an evacuation perimeter.
    18. present: It gives "Brooklyn Ave. NE and NE 45th St." and "the UW Tower" as the affected area.
    19. present: It is located at "Brooklyn Ave. NE and NE 45th St. near the UW Tower".
    20. present: It specifies "Brooklyn Ave. NE and NE 45th St. near the UW Tower" plus an evacuation perimeter.
    21. present: It specifies "Brooklyn Ave. NE and NE 45th St. near the UW Tower" and an evacuation perimeter.
    22. present: It gives "Brooklyn Ave. NE and NE 45th St." and "the UW Tower" as the affected area.
    23. present: It names "Brooklyn Ave. NE and NE 45th St." and the UW Tower.
    24. present: Locations include "UW Tower" and "Brooklyn Ave. NE and NE 45th St.".
    25. present: It gives "Brooklyn Ave. NE and NE 45th St. near the UW Tower" and an evacuation perimeter.
  • Guidancepresent25/25

    Final assessment

    Present, 25 of 25. Readers are told to "please continue to avoid the area until the leak is secured", and "Anyone leaving the UW Tower is asked to move to the south of the building".

    The protective action to take. A clear, specific instruction, such as shelter in place, evacuate, avoid the area, or run-hide-fight, drives faster and more correct protective behavior than describing the threat alone.

    See all 25 individual reads
    1. present: It says "please continue to avoid the area until the leak is secured" and describes the evacuation.
    2. present: People are told to avoid the area, evacuate the Tower and move south of the building.
    3. present: It repeatedly asks people to avoid the area, and says the Tower is being evacuated.
    4. present: It says "please continue to avoid the area until the leak is secured" and describes the evacuation.
    5. present: Readers are told "Please avoid the area" and the Tower is being evacuated.
    6. present: Readers are told "Please avoid the area" and that "The Tower is currently being evacuated".
    7. present: It says "please continue to avoid the area" and describes the ordered Tower evacuation.
    8. present: Readers are told to "continue to avoid the area until the leak is secured" during an evacuation.
    9. present: Readers are told "please continue to avoid the area" and those leaving the Tower to "move to the south".
    10. present: Readers are told to "please continue to avoid the area" and the Tower is being evacuated.
    11. present: Readers are told to "continue to avoid the area", and the Tower is being evacuated.
    12. present: Readers are told "Please avoid the area" and the Tower is "currently being evacuated".
    13. present: It says "Please avoid the area" and directs those leaving the Tower to move south.
    14. present: It says "please continue to avoid the area until the leak is secured" and notes the Tower is being evacuated.
    15. present: Readers are told to evacuate the Tower, "avoid the area until the leak is secured" and move south.
    16. present: It says "please continue to avoid the area" and describes the evacuation readers must follow.
    17. present: It says "Please avoid the area" and describes the Tower being evacuated with people moving south.
    18. present: It directs readers to "please continue to avoid the area until the leak is secured" and notes the Tower evacuation.
    19. present: Readers are told "please continue to avoid the area until the leak is secured" and the Tower is being evacuated.
    20. present: Readers are told to "please continue to avoid the area" and the Tower is being evacuated.
    21. present: It directs readers to "please continue to avoid the area" and notes the Tower "is currently being evacuated".
    22. present: It orders readers to "please continue to avoid the area" and reports the Tower being evacuated.
    23. present: Readers are told to "please continue to avoid the area until the leak is secured" and buildings are evacuated.
    24. present: It says "please continue to avoid the area" and reports the Tower "is currently being evacuated".
    25. present: Readers are told to "continue to avoid the area until the leak is secured" and the Tower is evacuated.
  • Timepresent25/25

    Final assessment

    Present, 25 of 25. Stamps run from the original post through "UPDATE at 3 p.m." to "UPDATE at 5:57 p.m.", plus an estimate of "two to three hours" to clear the leak.

    When the message applies. A timestamp, the word now or immediately, or a phrase like until further notice tells the reader whether the danger is current and how quickly to act.

    See all 25 individual reads
    1. present: Times run from the original post through updates at "3 p.m." and "5:57 p.m.".
    2. present: Times from the original post through 5:57 p.m. and a two to three hour estimate are given.
    3. present: Updates run from the original post through 5:57 p.m. with a two to three hour estimate.
    4. present: Updates carry clock times from the original post through 5:57 p.m.
    5. present: Many clock times appear, from the original post through "UPDATE at 5:57 p.m.".
    6. present: Every update carries a clock time and the incident date of October 14, 2019.
    7. present: Many clock times appear, including "UPDATE at 3:32 p.m." and the October 14, 2019 date.
    8. present: Clock times run from the original post through "5:57 p.m." with duration estimates.
    9. present: Multiple clock times appear, from "ORIGINAL POST" through "UPDATE at 5:57 p.m.".
    10. present: Clock times from "ORIGINAL POST" through "5:57 p.m." plus "until the leak is secured" mark timing.
    11. present: Times from the original post through 5:57 p.m. are given, with duration estimates.
    12. present: Timestamps run from "UPDATE at 2:35 p.m." to "UPDATE at 5:57 p.m." with a two to three hour estimate.
    13. present: Multiple clock times run from the original post through the 5:57 p.m. all clear.
    14. present: A sequence of times from the original post through "5:57 p.m." marks the timeline.
    15. present: Updates carry clock times from the original post through 5:57 p.m.
    16. present: Many stamps appear, from "ORIGINAL POST" through "UPDATE at 5:57 p.m." with "approximately 6 p.m.".
    17. present: Many stamps appear, including "UPDATE at 3 p.m." and an estimate of "two to three hours".
    18. present: Numerous clock stamps run from "ORIGINAL POST" through "5:57 p.m.", plus "two to three hours before".
    19. present: Numerous times appear, from "ORIGINAL POST" through "UPDATE at 5:57 p.m." and an estimate of two to three hours.
    20. present: Updates run from an original post through "5:57 p.m." with a two to three hour estimate.
    21. present: Numerous clock times appear, including "5:57 p.m." and an estimate of "two to three hours".
    22. present: Sequential clock times run from the original post through "5:57 p.m." with an explicit date.
    23. present: Many clock stamps appear, from the original post through "UPDATE at 5:57 p.m."
    24. present: Times run from the original post through "5:57 p.m." with estimates of "two to three hours".
    25. present: Multiple clock times appear, from "ORIGINAL POST" through "UPDATE at 5:57 p.m.".
  • Impactpresent25/25

    Final assessment

    Present, 25 of 25. Consequence is conveyed by the evacuation zone, the Tower "currently being evacuated", buildings reopened only "when they are deemed safe", and hours of road closures.

    What the hazard could do to the people in its path. Beyond naming the threat, a complete warning conveys its potential consequences or severity, such as that a tornado can level buildings or that a leak could be explosive, so recipients grasp how much danger they are in. Research on warning message content finds that a concrete impact statement helps people personalize their risk and act sooner.

    See all 25 individual reads
    1. present: An evacuation zone, buildings reopened only "when they are deemed safe" and traffic closures convey real danger.
    2. present: An evacuation zone and reopening buildings only when deemed safe convey real danger from the leak.
    3. present: An evacuation zone and buildings reopened only when deemed safe convey that the leak endangers occupants.
    4. present: The Tower is evacuated and buildings reopen only "when they are deemed safe", implying danger to occupants.
    5. present: An evacuation zone and reopening only "when they are deemed safe" convey real danger to occupants.
    6. present: The evacuation zone and the note that buildings reopen only "when they are deemed safe" convey real danger from the leak.
    7. present: Buildings are evacuated and reopened only "when they are deemed safe", implying real danger to occupants.
    8. present: An evacuation zone and buildings reopened only when "deemed safe" convey a danger to people nearby.
    9. present: An evacuation zone with an extended perimeter and buildings reopened only "when they are deemed safe" conveys real danger.
    10. present: An evacuation zone and reopening buildings only "when they are deemed safe" convey danger to occupants.
    11. present: The evacuation zone and reopening buildings only "when they are deemed safe" convey real danger to occupants.
    12. present: An evacuation zone and buildings reopened only "when they are deemed safe" convey a danger serious enough to clear people out.
    13. present: An evacuation zone and buildings reopened only "when they are deemed safe" convey real danger.
    14. present: An evacuation zone, an extended perimeter and buildings reopened only "when they are deemed safe" convey serious danger.
    15. present: An evacuation zone and reopening buildings only "when they are deemed safe" convey a serious danger to occupants.
    16. present: Evacuation of the Tower and reopening buildings only "when they are deemed safe" imply serious danger to occupants.
    17. present: An evacuation zone and reopening buildings only "when they are deemed safe" convey real danger.
    18. present: An expanding evacuation perimeter and buildings reopened only "when they are deemed safe" convey danger to occupants.
    19. present: An evacuation zone and perimeter extensions, with buildings reopened only "when they are deemed safe", convey real danger.
    20. present: An evacuation zone and reopening buildings only "when they are deemed safe" convey a serious danger to occupants.
    21. present: Severity is implied by an active evacuation zone and buildings reopened only "when they are deemed safe".
    22. present: The evacuation zone, extended perimeter, and reopening only when buildings are "deemed safe" convey real danger.
    23. present: An "evacuation zone" and reopening only "when they are deemed safe" convey a danger serious enough to clear buildings.
    24. present: The evacuation zone and buildings reopening only "when they are deemed safe" convey danger to occupants.
    25. present: Evacuating a zone and reopening buildings only "when they are deemed safe" conveys a danger to occupants.

Coded by Claude Opus 5

Systematic AI judgments with visible reasoning, not human-validated codings.

About this analysis
Context

Background

Official UW Alert archive entry.
Analysis

Key Findings

Official archive page preserves complete alert text.
Outcome
See official notice for status.
Provenance

Sources

Every claim on this page is meant to be checkable. Open the links below (and the Verify this quote control under each confirmed alert) to read the original university, news, or archive page yourself. Hostnames are shown so you can see where you are going; archived copies survive when live pages move or disappear. See also our methodology.

  1. Official
Cite this case

Campus Alert Archive. "University of Washington: Gas leak reported near tower complex." Incident of October 14, 2019. Added July 2026; last updated August 2026. https://campusalertarchive.com/case/university-of-washington-uw-alert-gas-leak-near-uw-tower-2019-10-14/

Download case JSON

Alert text quoted on this page remains the work of the issuing institution; the archive is a secondary source.

Tags
washingtonuwuw-alertweather
Added July 2026Updated August 2026Via ingestion